Authentication
248x Tipe XLS Ukuran file 0.14 MB Source: darmadi18.files.wordpress.com
Sheet 1: mm41
No | NAMA | NO. POKOK | JUDUL TUGAS AKHIR | DOSEN PEMBIMBING | Ket |
1 | BERIZKA ARDANIS | 2015731150047 | PERANCANGAN SISTEM DRAINASE BARU JALAN KALIMANTAN KOTA GRESIK | Ir. Darmadi, MM | OKE |
2 | BESTEN JOYMEN | 2015731150048 | ANALISIS PERBANDINGAN BIAYA PELAKSANAAN PONDASI CORRUGATED CONCRETE SHEET PILE DAN BORE PILE PADA LERENG SUTET KOTA DELTAMAS | Ir. Darmadi, MM | OKE |
3 | HANNIF ARIASTO RAHARJO | 2015731150064 | PERANCANGAN PERBAIKAN SERVICE ROAD AREA TERMINAL KARGO DI BANDARA SOEKARNO-HATTA | Ir. Darmadi, MM | OKE |
4 | JHON POLTAK RIZKY SIMAMORA | 2015731150069 | PERANCANGAN PELEBARAN SALURAN DRAINASE AIRSIDE DI BANDARA HALIM PERDANA KUSUMA | Ir. Darmadi, MM | OKE |
5 | MUHAMMAD LUTHFI | 2015731150074 | PERANCANGAN PONDASI TOWER SST 42 M | Ir. Darmadi, MM | OKE |
6 | RAJA UMAR | 2015731150077 | ANALISIS PERENCANAAN STRUKTUR BENDUNG TETAP GUNUNG NAGO KOTA PADANG | Ir. Darmadi, MM | OKE |
7 | SARAH ADISTIA SORAYA | 2015731150082 | ANALISIS DEBIT BANJIR PADA NORMALISASI KALI KRUKUT RUAS RENGAS HINGGA MESEUM WIDYA CHANDRA | Ir. Darmadi, MM | (-) Baja |
8 | BUDIMAN OKTOPRANA | 2014731150049 | PERANCANGAN DIMENSI SALURAN DRAINASE CLUSTER MISSISSIPPI JAKARTA GARDEN CITY CAKUNG JAKARTA TIMUR - DKI JAKARTA | Ir. Darmadi, MM | (-) Matrikulasi: Statika, Mek. Bahan, Mek, Fluida |
9 | ABDI DZIL IKRAM | 2015731150041 | ESTIMASI DAN CASH FLOW PEKERJAAN STRUKTUR PONDASI PROYEK HOTEL LE PREMIERE KOTA DELTAMAS | Ir. Eri Setia Romadhon, MT | OKE |
10 | APIF NUR IMAM | 2015731150043 | PERHITUNGAN VOLUME PEKERJAAN STRUKTUR PADA BANGUNAN GEDUNG DENGAN MENGGUNAKAN SOFTWARE MODELLING UNTUK MENDAPATKAN NILAI EFISIENSI BIAYA PROYEK | Ir. Eri Setia Romadhon, MT | OKE |
11 | BIERDE BIEDENKOPF GIEOVANDO | 2015731150049 | PENGENDALIAN PROYEK PEMBANGUNAN SEKOLAH AL AZHAR TAHAP II SUMMARECON BEKASI | Ir. Eri Setia Romadhon, MT | OKE |
12 | DERIANSYAH ABDULLAH | 2015731150053 | PERANCANGAN PERKERASAN LENUR TAXIWAY NC3 UNTUK JENIS PESAWAT AIRBUS B747-400 DI BANDARA SOEKARNO - HATTA | Ir. Eri Setia Romadhon, MT | (-) Jembatan |
14 | MUHAMAD AULIA ARASY | 2015731150072 | PERHITUNGAN ANGGARAN BIAYA PROYEK PERUMAHAN SERPONG LAGOON TYPE 84 | Ir. Eri Setia Romadhon, MT | OKE |
15 | RHIDWHAN FADHEL ARIP RIZQHIAL | 2015731150079 | PERHITUNGAN LINTASAN KRITIS PADA PROYEK PEMBANGUNAN APARTEMEN MARIGOLD NAVA PARK - BSD CITY | Ir. Eri Setia Romadhon, MT | OKE |
16 | SITI RAHMAWATI | 2015731150086 | RANCANGAN CAMPURAN BETON MUTU TINGGI DENGAN PENAMBAHAN ADMIXTURE HIGH-SUPERPLASTISIZER & RETARDER PADA PROYEK TAMAN ANGGREK RESIDENCE | Ir. Eri Setia Romadhon, MT | OKE |
17 | LEONARD THONI B. MANURUNG | 2014731150121 | ANALISIS PERCEPATAN PEMBANGUNAN PROYEK JEMBATAN PENYEBERANGAN ORANG (JPO) KOTA DEPOK | Ir. Eri Setia Romadhon, MT | OKE |
45 | RIOLAN SAGALA | 2015731150080 | ANALISIS PENGARUH VARIASI DIMENSI KOLOM TERHADAP KINERJA BATAS LAYAN DAN KINERJA BATAS ULTIMIT PADA PORTAL GEDUNG 5 LANTAI DI DAERAH RAWAN GEMPA YANG MENGACU PADA SNI 03-1726-2002 | Ir. Eri Setia Romadhon, MT | (-) Mat.Jalan |
18 | BANI PRATAMA | 2015731150045 | EVALUASI PEMBANGUNAN PERMUKIMAN DITINJAU DARI ASPEK BIAYA, WAKTU DAN MANAJEMEN STUDI KASUS: PEMBANGUNAN RUMAH TINGGAL ORCHARD PARK BATAM | Ir. Fatmawati Oemar, MM | OKE |
19 | DIANTO NUR UTOMO | 2015731150055 | PERBANDINGAN BIAYA SEWA BEKISTING PERI SYSTEM PADA PROYEK HOTEL GRAND CLASIC CIKARANG DENGAN BEKISTING KONVENSIONAL | Ir. Fatmawati Oemar, MM | OKE |
20 | FIRMAN RIZKY ANNANDA | 2015731150062 | ANALISIS KELONGSORAN PADA TEBING SUNGAI CILIWUNG DI PERUMAHAN PESONA KHAYANGAN DEPOK | Ir. Fatmawati Oemar, MM | OKE |
21 | IPNU SUPRIYANTO | 2015731150067 | PENINGKATAN PELAYANAN RUAS JALAN PADA JALAN RAYA PASAR MINGGU, JAKARTA SELATAN | Ir. Fatmawati Oemar, MM | OKE |
22 | JANNE ASTRIA BANJAR NAHOR | 2015731150068 | PERANCANGAN EAST CROSS TAXIWAY DI BANDARA SOEKARNO-HATTA | Ir. Fatmawati Oemar, MM | OKE |
23 | SABIRIN | 2015731150081 | PERANCANGAN PERPANJANGAN TAXIWAY NP1 PROYEK BANDARA SOEKARNO-HATTA KOTA TANGERANG | Ir. Fatmawati Oemar, MM | (-) Jembatan |
24 | SIGIT WURYANTO | 2015731150085 | PERHITUNGAN RENCANA ANGGARAN PELASANAAN PEMBANGUNAN GEDUNG LABORATORIUM KEMENTRIAN PERHUBUNGAN | Ir. Fatmawati Oemar, MM | (-) Matrik, Jembatan, Prategang |
25 | ANISA TAQIATUN BARI'AH | 2015731150042 | PERHITUNGAN WAKTU DAN ANGGARAN BIAYA PELASANAAN PROYEK BIOGAS TEPUNG TAPIOKA | Ir. Indartono Rivai, MM | OKE |
26 | CHRISTINA ADATTA SITORUS | 2015731150052 | PENANGANAN KAWASAN KUMUH MENGACU PADA PERATURAN MENTERI PEKERJAAN UMUM NO.1 TAHUN 2014 (LOKASI?) | Ir. Indartono Rivai, MM | (-) Mek. Fluida, Statika |
27 | DICKY WIJAYA | 2015731150056 | PERANCANGAN FLEXIBLE PAVEMENT TAXIWAY NCW UNTUK JENIS PESAWAT AIRBUS A380-800 DI BANDARA SOEKARNO-HATTA | Ir. Indartono Rivai, MM | OKE |
28 | FERDIA SUSANTI | 2015731150060 | PENGENDALIAN WAKTU DAN BIAYA BEKISTING SYSTEM PERI UP PADA PROYEK RS ADMAJAYA JAKARTA | Ir. Indartono Rivai, MM | OKE |
29 | NUR ULFAH BAHRI HALIM | 2015731150076 | EFEKTIVITAS PENGGUNAAN TOWER CRANE PADA PROYEK PROJECT DISTRICT 8 LOT 28 | Ir. Indartono Rivai, MM | OKE |
30 | TITO SUCIPTO | 2015731150088 | ANALISIS BIAYA DAN WAKTU BEKISTING VERTIKAL SISTEM ENKOFORM V-100 PROYEK GRAND MANSION APARTMENT JAKARTA | Ir. Indartono Rivai, MM | OKE |
31 | TRIANDY BAYU PRIHASTONO | 2015731150090 | ANALISIS PERBANDINGAN WAKTU DAN BIAYA BEKISTING PELAT BALOK PADA GREEN PRAMUKA CITY TOWER MAGNOLIA | Ir. Indartono Rivai, MM | OKE |
32 | YANE KINANTI DE YOLA NULE | 2015731150095 | PERANCANGAN PERLUASAN APRON AREA KARGO DI BANDARA SOEKARNO-HATTA | Ir. Indartono Rivai, MM | OKE |
33 | HENDRI SUJADMIKO | 2014731150059 | PRODUKTIVITAS ALAT BERAT DALAM PEKERJAAN GALIAN PADA PROYEK PEMBANGUNAN GEDUNG PELAYANAN KESEHATAN RS St.CAROLUS, JAKARTA PUSAT | Ir. Indartono Rivai, MM | (-) Matrikulasi: Statika, Mek. Bahan, Mek, Fluida |
34 | RISWAN OKI FERNANDO SIDABUTAR | 2014731150141 | PERHITUNGAN RENCANA ANGGARAN PELAKSANAAN (RAP) PROYEK PEMBANGUNAN APARTEMEN THE GREEN PRAMUKA RESIDENCE TOWER ORCHID | Ir. Indartono Rivai, MM | OKE |
35 | FAJAR YUSUF ARDANI | 2015731150058 | ANALISIS KEBUTUHAN PARKING STAND APRON PIER 2 TEMINAL 3 ULTIMATE BANDARA SOEKARNO-HATTA | Ir. Sri Yuniarti, MT | OKE |
36 | HERIS CAHYA KUSUMA | 2015731150065 | OPTIMASI PENANGANAN DAMPAK RENCANA PEMBANGUNAN SPBU SHELL DI KOTA TANGERANG SELATAN | Ir. Sri Yuniarti, MT | (-) Mek. Bahan |
37 | LUTHFIANA SARI DEWI | 2015731150071 | ANALISIS ANALISIS DAMPAK LALU LINTAS PEMBANGUNAN APARTEMEN GREEN HILLS (LOKASI?) | Ir. Sri Yuniarti, MT | (-) Mek. Bahan |
38 | RATNA DEWI SARTIKA | 2015731150078 | ANALISIS PENINGKATAN KESELAMATAN PADA PERLINTASAN SEBIDANG JPL NO.81 BEKASI | Ir. Sri Yuniarti, MT | OKE |
39 | YUDA MANDALA PUTRA C | 2015731150097 | PERANCANGAN PEMBUATAN APRON B73 TERMINAL 1 BANDAR UDARA INTERNASIONAL SOEKARNO-HATTA | Ir. Sri Yuniarti, MT | (-) 6 MK (Harus Kuliah) |
40 | AYU FITRI WIJAYANTI | 2014731150093 | ANALISIS ANGKUTAN BARANG DI KECAMATAN CICURUG KABUPATEN SUKABUMI | Ir. Sri Yuniarti, MT | (-) Statika |
41 | SANDY RIMAWAN | 2014731150072 | ANALISIS DAN REKAYASA PERSIMPANGAN SGC CIKARANG DI KABUPATEN BEKASI | Ir. Sri Yuniarti, MT | OKE |
13 | GABE PARDAMEAN SIDABUTAR | 2015731150063 | EVALUASI PROYEK PEMBANGUNAN KANTOR KELURAHAN PONDOK BETUNG DENGAN MENGGUNAKAN MS.PROJECT | Ir. Sudarwati, MM | (-) Mek. Bahan |
42 | BUDI DERMAWAN | 2015731150050 | ANALISIS BIAYA DAN WAKTU METODE PELAKSANAAN PEKERJAAN SALURAN BETON PRECAST ON SITE DAN SALURAN BETON KONVENSIONAL PADA PROYEK POS LINTAS NEGARA ENTIKONG | Ir. Sudarwati, MM | OKE |
43 | CAECILIA PATRICIA YOLANDA | 2015731150051 | PERANCANGAN PERLUASAN APRON NSA DI TERMINAL 1 BANDARA SOEKARNO-HATTA | Ir. Sudarwati, MM | OKE |
44 | MUHAMMAD MUGHNY HALIM | 2015731150073 | PERANCANGAN KADAR ASPAL OPTIMUM PADA LAPIS AUS (AC-WC) PROYEK PEMELIHARAAN JALAN TOL CAWANG-TOMANG-CENGKARENG | Ir. Sudarwati, MM | OKE |
46 | UMAMUL HUSEN | 2015731150091 | ANALISIS PERKERASAN LAPANGAN PARKIR KENDARAAN DI LOKSI M-1 BANDARA SOEKARNO-HATTA | Ir. Sudarwati, MM | OKE |
47 | RIZALDY FEBRIYANTO | 2012731150175 | ANALISIS BIAYA PELAT LANTAI SISTEM HOLLOW CORE SLAB (HCS) DENGAN PELAT LANTAI KONVENSIONAL PADA BANGUNAN SECONDARY BUILDING PT. HM SAMPOERNA PROJECT KARAWANG | Ir. Sudarwati, MM | (-) Man.Kon, Etika Profesi |
48 | RUDDY HADI PRIANSAH | 2012731150141 | PERBAIKAN TANAH DASAR DENGAN METODE CTRB PADA JALAN MALINGPING - BAYAH KAB. LEBAK | Ir. Sudarwati, MM | OKE |
49 | BAMBANG PURWANTO AGUS SAPUTRO | 2015731150044 | BELUM PROPOSAL | ||
50 | BENN HUDSON | 2015731150046 | BELUM PROPOSAL | ||
51 | DEVI APRILIA SARI | 2015731150054 | BELUM PROPOSAL | ||
52 | ERWIN PARLINDUNGAN | 2015731150057 | BELUM PROPOSAL | ||
53 | FARIS WIDYANTO | 2015731150059 | BELUM PROPOSAL | ||
54 | FERNANDO TUA BUTAR BUTAR | 2015731150061 | BELUM PROPOSAL | ||
55 | ICHSAN ADITYA | 2015731150066 | BELUM PROPOSAL | ||
56 | KURNIAWAN BIMA PRAKOSO | 2015731150070 | BELUM PROPOSAL | ||
57 | NATAL GUNANTA PURBA | 2015731150075 | BELUM PROPOSAL | ||
58 | SHINTA RATNA AFIANINGRUM | 2015731150083 | BELUM PROPOSAL | ||
59 | SIDIQ DWI SAPUTRA | 2015731150084 | BELUM PROPOSAL | ||
60 | SULARNO | 2015731150087 | BELUM PROPOSAL | ||
61 | TRI ASTUTI PRASANTI | 2015731150089 | BELUM PROPOSAL | ||
62 | VIDIA WIDIASTUTI WIYONO | 2015731150092 | BELUM PROPOSAL | ||
63 | WAHYU BAGUS SETIYAWAN | 2015731150093 | BELUM PROPOSAL | ||
64 | WAHYU BAGUS SETIYONO | 2015731150094 | BELUM PROPOSAL | ||
65 | YANUAR WIDYARSA | 2015731150096 | BELUM PROPOSAL | ||
Catatan : | |||||
1. Syarat Tugas Akhir Nilai harus lengkap dan minimal D | JAKARTA, 18 OKTOBER 2016 | ||||
2. Lunas Pembayaran Uang Kuliah sampai bulan Oktober 2016 | KETUA PROGRAM PLTS | ||||
3. Pelaksanaan Seminar & Sidang Januari 2017 | |||||
4. Untuk Kartu Presensi Bimbingan bisa di ambil di Bpk. Shidik/ Gufron | |||||
5. Kartu Presensi Bimbingan harus ditandatangi pembimbing dan untuk syarat mengikuti sidang | IR. ERI SETIA ROMADHON, MT. | ||||
6. Judul TA sesuai dengan yang tertera di atas, TIDAK BOLEH diubah dan penyusunan HARUS sesuai dengan pedoman |
JADWAL SEMINAR TUGAS AKHIR | ||||||||
MAHASISWA PROGRAM LANJUTAN, KELAS KARYAWAN & REGULER | ||||||||
PROGRAM STUDI TEKNIK SIPIL SEMESTER GENAP 2014/2015 | ||||||||
HARI SABTU TANGGAL 16 MEI 2015 JAM : 10.00 | ||||||||
No | NAMA | NO. POKOK | JUDUL TUGAS AKHIR | DOSEN PEMBIMBING | ||||
1 | ADITYO ARYA PUTRA | 2013731150096 | INTEGRASI TRANSPORTASI AKTIVITAS ANGKUTAN SUNGAI PADA DERMAGA RAMBANG, DERMAGA GUNUNG MAS, DAN DERMAGA FLAMBOYAN DI KOTA PALANGKARAYA | IR. DARMADI, MM. | 1 | |||
2 | ANISYA | 2013731150098 | TINJAUAN PEMANCANGAN PONDASI PADA PROYEK GEDUNG BPK PENABUR HARAPAN INDAH BEKASI BERKAITAN DENGAN KINERJA WAKTU | IR. DARMADI, MM. | 2 | IR. H. INDARTONO RIVAI, MM. | ||
3 | DIAN SEPTIANI | 2013731150104 | KAJIAN PENGARUH KETEBALAN LAPIS PERMUKAAN KONSTRUKSI LASTON TERHADAP BIAYA OPERASIONAL (BOK) (STUDI KASUS JALAN PANGERAN JAYAKARTA BEKASI) | IR. DARMADI, MM. | 3 | IR. DARMADI, MM. | ||
4 | MOCHAMAD ARRY PAMUNGKAS | 2013731150127 | ANALISIS DAYA DUKUNG PONDASI BORED PILE PROYEK SILOAM HOSPITALS AMBON MALUKU | IR. DARMADI, MM. | 4 | IR. ERI SETIA ROMADHON, MT. | ||
5 | MUHAMMAD NUR FAJAR | 2013731150130 | ANALISA POTENSI TRANSPORTASI SUNGAI DAN DANAU DI PROVINSI JAMBI DAN SUMATERA BARAT | IR. DARMADI, MM. | 5 | IR. HJ. FATMAWATI OEMAR, MM. | ||
6 | SUSAN KARMILA .A. NDAUMANU (35) | 2012731150132 | ANALISIS KEMACETAN LALU LINTAS PASAR TAMBUN ( STUDI KASUS DI KABUPATEN BEKASI) | IR. DARMADI, MM. | 6 | IR. SRI YUNIARTI, MT. | ||
7 | ZULHADI | 2013731150141 | PERENCANAAN DERMAGA KAYAN GUNA KELANCARAN DAN KEAMANAN BONGKAR MUAT DI TANJUNG SELOR KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA | IR. DARMADI, MM. | 7 | IR. SUDARWATI, MM. | ||
8 | WIRA ADI PUTRA | 2013731150138 | ANALISIS STRUKTUR ANJUNGAN LEPAS PANTAI JACKET STEEL PLATFORM DENGAN METODE SACS PADA PEMBANGUNAN MENARA TAMBAT PROYEK BANYU URIP EPC 3 | IR. DARMADI, MM. | 8 | |||
9 | BUDI SANTOSO | 2013731150100 | PENANGANAN JARINGAN JALAN DI PROVINSI BANTEN BERDASARKAN KAJIAN HIRARKI FUNGSI JALAN | IR. ERI SETIA ROMADHON, MT. | 1 | |||
10 | DIKY DWI PERMANA | 2013731150105 | ANALISA PENGENDALIAN BIAYA DAN WAKTU DENGAN METODE PEMBADING KURVA-S (EARNED VALUE METHOD) DAN MICROSOFT PROJECT 2007 PADA PEMBANGUNAN JEMBATAN CILIWUNG CIJAGO-2A DEPOK | IR. ERI SETIA ROMADHON, MT. | 2 | |||
11 | EKA ADITIO | 2013731150108 | ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK TRANSMART CARREFOUR CIPADUNG | IR. ERI SETIA ROMADHON, MT. | 3 | |||
12 | LANTIP ARINDANG LAKSANA | 2013731150121 | ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK STRUKTUR APARTEMENT ROYALE SPRINGHILL RESIDENCES KEMAYORAN | IR. ERI SETIA ROMADHON, MT. | 4 | |||
13 | MASITA PUTRA MARSAL MAILILI | 2013731150126 | PENERAPAN KLAIM KONTRUKSI DAN PERHITUNGAN ESKALASI PROYEK PEMBANGUNAN JALAN LINGKAR BARAT DURI, BENGKALIS | IR. ERI SETIA ROMADHON, MT. | 5 | |||
14 | MUHAMMAD FADHLI RAHMAN | 2013731150129 | ANALISIS PENGENDALIAN BIAYA DAN WAKTU PROYEK PERUMAHAN TAMAN SERUNI INDAH BEKASI SELATAN | IR. ERI SETIA ROMADHON, MT. | 6 | |||
15 | ALVARO ALAMSYAH SUJATMIKO | 2013731150097 | PERENCANAAN RUNWAY END SAFETY AREA 07L, 25R, 07R, 25L DI BANDAR UDARA SOEKARNO HATTA | IR. ERI SETIA ROMADHON, MT. | 7 | |||
16 | MONIKA PRISKI SIHOMBING | 2013731150128 | ANALISIS BIAYA DAN WAKTU PADA PEKERJAAN DINDING LUAR DENGAN PERBANDINGAN MENGGUNAKAN BATA RINGAN DAN BETON PRECAST DALAM PELAKSANAAN PROYEK WOODLAND PARK RESIDENCE | IR. ERI SETIA ROMADHON, MT. | ||||
17 | IQOH PERTINI (KK) | 2011731150051 | ANALISIS PENGARUH PENAMBAHAN FLY ASH PADA CAMPURAN BETON | IR. ERI SETIA ROMADHON, MT. | ||||
18 | ADHI GHUNA IRMONO | 2013731150095 | ANALISA SISTEM PENGENDALIAN PROYEK PADA PROYEK PEMBANGUNAN PABRIK NUTRIFOOD SENTUL | IR. H. INDARTONO RIVAI, MM. | 1 | |||
19 | EKO SUGIYONO | 2013731150109 | PERENCANAAN GAYA TARIKAN TENDON BALOK PRATEGANG PADA JEMBATAN CIKARANG LOKASI STA 1+265 BEKASI JAWA BARAT | IR. H. INDARTONO RIVAI, MM. | 2 | |||
20 | JAROT HERU SUMARKO | 2013731150119 | ANALISIS DAYA DUKUNG PONDASI BORED PILE PROYEK JEMBATAN KALIMALANG CIBITUNG STA 3 + 970 KEBUPATEN BEKASI JAWA BARAT | IR. H. INDARTONO RIVAI, MM. | 3 | |||
21 | LUSIANA RAMADANI | 2013731150123 | ANALISIS STABILITAS LERENG SUNGAI CILIWUNG DENGAN METODE FELLENIUS DAN PERANGKAT LUNAK SLOPE-W DI KELURAHAN MEKAR JAYA DEPOK | IR. H. INDARTONO RIVAI, MM. | 4 | |||
22 | RODIANTO | 2013731150134 | ANALISA PENGUJIAN PONDASI TIANG PANCANG DENGAN PILE DRIVING ANALYZER (PDA) PADA JEMBATAN BANYUMULEK DI PROPINSI NUSA TENGGARA BARAT | IR. H. INDARTONO RIVAI, MM. | 5 | |||
23 | SEFTIA ANNISA A.T | 2013731150136 | TINJAUAN PENGARUH PASANG SURUT ALUR PELAYARAN SUNGAI MUSI TERHADAP UPAYA PENINGKATAN KESELAMATAN BERLAYAR KAPAL TONGKANG DAN TUGBOAT ( STUDI KASUS ALUR PELAYARAN DI BAWAH JEMPATAN AMPERA KOTA PALEMBANG) | IR. H. INDARTONO RIVAI, MM. | 6 | |||
24 | YUL KAUTSAR HAKIM | 2013731150139 | PERANCANGAN PONDASI TIANG BOR (BORED PILE) PADA PEMBANGUNAN JEMBATAN CIKARANG LOKASI 1 STA 1+265 BEKASI JAWA BARAT | IR. H. INDARTONO RIVAI, MM. | 7 | |||
25 | HENDRA HERMANSYAH WHISNUWARDHANA | 2013731150116 | ANALISIS DAYA DUKUNG PONDASI BORED PILE PROYEK JEMBATAN KALIMALANG CIBITUNG STA 1 + 335 KEBUPATEN BEKASI JAWA BARAT | IR. H. INDARTONO RIVAI, MM. | 8 | |||
26 | DEDY SUTOMO | 2013731150102 | ANALISA PENGENDALIAN WAKTU PEKERJAAN STRUKTUR PROYEK PEMBANGUNAN APARTEMEN GREEN PRAMUKA CITY JAKARTA | IR. HJ. FATMAWATI OEMAR, MM. | 1 | |||
27 | DEWI SARTIKA | 2013731150103 | ANALISA FASILITAS DERMAGA MAHAKAM HILIR DIKOTA SAMARINDA PROVINSI KALIMANTAN TIMUR | IR. HJ. FATMAWATI OEMAR, MM. | 2 | |||
28 | EDY SYAHPUTRA | 2013731150107 | PERENCANAAN PELEBARAN JALAN RUAS C1 & C2 BANDARA SOEKARNO HATTA | IR. HJ. FATMAWATI OEMAR, MM. | 3 | |||
29 | IMAM PURNOMOPUTRO | 2013731150117 | ANALISA PENJADWALAN PADA PROYEK PEMBANGUNAN ALILA HOTEL SCBD JAKARTA | IR. HJ. FATMAWATI OEMAR, MM. | 4 | |||
30 | IRSAN SUBYARTO | 2013731150118 | PENATAAN JARINGAN TRAYEK ANGKUTAN SUNGAI DIKABUPATEN BARITO KUALA PROVINSI KALIMANTAN SELATAN (STUDY KASUS: SUNGAI BARITO DI MARABAHAN) | IR. HJ. FATMAWATI OEMAR, MM. | 5 | |||
31 | YULIA PERMATA SARI | 2013731150140 | TINJAUAN ALUR PELAYARAN TERHADAP BONGKAR MUAT KAPAL LINTAS KAMPUNG BARU - KARIANGKAU KOTA BALIKPAPAN KALIMANTAN TIMUR | IR. HJ. FATMAWATI OEMAR, MM. | 6 | |||
32 | MUSA ALMANFHALUTHY (Ang. 36) | 2012731150171 | KAJIAN ULANG STRUKTUR BALOK DAN KOLOM PADA BANGUNAN HOTEL ARTOTEL SURABAYA | IR. HJ. FATMAWATI OEMAR | 7 | |||
33 | DWI KURNIADI GUNAWAN | 2013731150106 | ANALISA KELAYAKAN ANGKUTAN MASSAL DI KOTA SURABAYA (STUDI KASUS: TRAM SURABAYA) | IR. SRI YUNIARTI, MT. | 1 | |||
34 | FITRI AGUSTIEN | 2013731150113 | PENINGKATAN FASILITAS PENUMPANG COMMUTER LINE DI STASIUN SWAH BESAR BERDASARKAN STANDAR PELAYANAN MINUMAN | IR. SRI YUNIARTI, MT. | 2 | |||
35 | FURQON SATRIO NUGROHO | 2013731150114 | PENINGKATAN FASILITAS PELAYANAN JASA TRANSPORTASI ANGKUTAN UMUM PADA KAWASAN STASIUN PURWOKERTO | IR. SRI YUNIARTI, MT. | 3 | |||
36 | NIKEN DWIKINASIH | 2013731150131 | KAJIAN PENGEMBANGAN FASILISAS PELAYANAN STASIUN KLENDER | IR. SRI YUNIARTI, MT. | 4 | |||
37 | RADEN AYU DWI RETNO ANGGRAINI | 2013731150133 | ANALISA TERHADAP FASILITAS SANDAR DAN SISTEM TAMBAT DI DERMAGA 36 ILIR KOTA PALEMBANG | IR. SRI YUNIARTI, MT. | 5 | |||
38 | HANS INDHRA HADI SUNARSONO | 2013731150115 | MENDESIGN PERKERASAN BARU LANDASAN PACU UTARA BANDAR UDARA SOEKARNO - HATTA | IR. SRI YUNIARTI, MT. | 6 | |||
39 | BAYU AJI FAJAR RESPATI | 2013731150099 | PERENCANAAN ANGKUTAN UMUM MASSAL KORIDOR MADIUN - PONOROGO | IR. SRI YUNIARTI, MT. | ||||
40 | DEA FIKRIANI ROSYADI | 2013731150101 | ANALISA PERBANDINGAN EFISIENSI PERAWATAN JALAN REL ANTARA SISTEM PEMECOKAN MANUAL DENGAN SISTEM BEDAH SITI | IR. SUDARWATI, MM. | 1 | |||
41 | FIKI NUR HIDAYANTI | 2013731150112 | EVALUASI KINERJA KERETA API COMMUTER LINE JABODETABEK LINTAS TANAHABANG-MAJA | IR. SUDARWATI, MM. | 2 | |||
42 | KUKUN DESRIANI | 2013731150120 | KAJIAN KELAYAKAN EKONOMI PENGEMBANGAN JARINGAN JALAN KE LOKASI OBJEK WISATA DI KOTA LEMBANG KABUPATEN BANDUNG | IR. SUDARWATI, MM. | 3 | |||
43 | LISA FAOZIATUZZAHROH | 2013731150122 | KAJIAN EVALUASI KINERJA JARINGAN JALAN DI KOTA JABABEKA TAHUN 2014 | IR. SUDARWATI, MM. | 4 | |||
44 | MUHAMMAD DANU PRAWIRA | 2013731150124 | EVALUASI KESELAMATAN DI PERLINTASAN SEBIDANG PADA LINTAS JATINEGARA - BEKASI | IR. SUDARWATI, MM. | 5 | |||
45 | SHIFA FAUZIAH | 2013731150137 | PERANCANGAN SALURAN DRAINASE GELANGGANG REMAJA CIKARANG PUSAT KABUPATEN BEKASI | IR. SUDARWATI, MM. | 6 | |||
46 | MARTIN MONANG | 2013731150125 | PENUTUPAN PERLINTASAN SEBIDANG YON ZIKON GUNA MEMPERLANCAR BONGKAR KA BARANG DI KERTAPATI | IR. SUDARWATI, MM. | ||||
47 | EVANDER WYK | 2013731150110 | TIDAK AKTIF | |||||
48 | FAKHMI ARDIANSYAH | 2013731150111 | TIDAK AKTIF | |||||
49 | PINTOR MANURUNG | 2013731150132 | TIDAK AKTIF | |||||
50 | RONY LESMANA | 2013731150135 | TIDAK AKTIF | |||||
51 | RAHMAT EKAPUTRA AMO (37) | 2013731150072 | NILAI KURANG TIDAK BOLEH TUGAS AKHIR | |||||
Catatan : | ||||||||
1. Syarat Tugas Akhir Nilai harus lengkap minimal D | JAKARTA, 11 MARET 2015 | |||||||
2. Syarat Keuangan, sebelum angsuran mencapai 10 Jutaan tidak diperkenankan mengambil skripsi/TA | KOORDINATOR TUGAS AKHIR | |||||||
2. Bagi yang belum disetujui dan yang belum mengajukan proposal harus segera mengajukan | ||||||||
3. Pelaksanaan Seminar Awal Mei & Sidang Akhir Mei 2015 | ||||||||
IR. H. INDARTONO RIVAI, MM. |
JADWAL PEMBIMBING TUGAS AKHIR SEMESTER GANJIL 2015/2016 | ||||||||
PROGRAM STUDI TEKNIK SIPIL LANJUTAN ANGKATAN 39 FTSP UNIVERSITAS JAYABAYA | ||||||||
No | NAMA | NO. POKOK | JUDUL TUGAS AKHIR | DOSEN PEMBIMBING | Ket | |||
1 | ADITYA TRINANDA | 2014731150043 | PERENCANAAN DESAIN DEPO BUS BERWAWASAN LINGKUNGAN | IR. DARMADI, MM. | OKE | 2 | ||
2 | ANNISA FEBRIANENI | 2014731150045 | PERENCANAAN DIMENSI SALURAN DRAINASE PERUMAHAN GRAHA MAMPANG MAS KOTA DEPOK | IR. DARMADI, MM. | OKE | 3 | 11 | |
3 | FANY RIZKI SYAIFTIAWAN | 2014731150056 | PERENCANAAN SISTEM DARINASE PERUMAHAN GRAND DEPOK RESIDENCES BEJI DEPOK | IR. DARMADI, MM. | OKE | 4 | ||
4 | GUNTARA LARICHIS | 2014731150057 | KOMBINASI METODE PRECAST DAN TEKNOLOGI TUNNELING BORING PADA SODETAN SUNGAI CILIWUNG KE KANAL BANJIR TIMUR 9SALURAN FLOODWAY) | IR. DARMADI, MM. | OKE | IR. DARMADI, MM. | ||
5 | RACHMAT SYAEFULLOH | 2014731150069 | PERENCANAAN SISTEM DARINASE PERUMAHAN GRIYA BUKIT JAYA 2 | IR. DARMADI, MM. | OKE | IR. H. INDARTONO RIVAI, MM. | ||
6 | YOURDAN MARTUA PASARIBU | 2014731150079 | STUDI ANALISIS DAMPAK SOSIAL AKIBAT PROYEK JALAN TOL DEPOK - ANTASARI | IR. DARMADI, MM. | OKE | IR. HJ. FATMAWATI OEMAR, MM. | ||
7 | EDWIN TIMOTIUS | 2014731150052 | ANALISIS WAKTU DAN BIAYA PADA TOWER ORCHID PROYEK THE GREEN PRAMUKA APARTEMENT | IR. ERI SETIA ROMADHON, MT. | OKE | IR. ERI SETIA ROMADHON, MT. | ||
8 | HENDRI SUJADMIKO | 2014731150059 | ANALISA PERBANDINGAN BIAYA DAN WAKTU PEMBANGUNAN JEMBATAN DENGAN PONDASI PANCANG DAN JEMBATAN DENGAN PEMADATAN TANAH SEBAGAI AKSES JALAN PADA PROYEK BANGUNAN PDC STALL & STOCK YARD TOYOTA AUTO 2000 KARAWANG BARAT | IR. ERI SETIA ROMADHON, MT. | OKE | IR. SUDARWATI, MM. | ||
9 | KHARISMA RIZKY WIBAWA | 2014731150060 | ANALISA PERCEPATAN DURASI PROYEK DENGAN METODE PERTUKARAN WAKTU DAN BIAYA PADA PROYEK APARTEMENT GREEN PRAMUKA CITY | IR. ERI SETIA ROMADHON, MT. | OKE | IR. SRI YUNIARTI, MT. | ||
10 | LIPIA LULU RENGGANIS | 2014731150061 | KLAUSUL PERISTIWA KOMPENSASI PADA KONTRAK KONSTRUKSI DAN TUNJAUAN PROSES KLAIM DI LAPANGAN | IR. ERI SETIA ROMADHON, MT. | OKE | |||
11 | OKTO RISCKI PRASETIYO | 2014731150065 | ANALISIS PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK MINING STORAGE P-14 PT. INDOCEMENT TUNGGAL PRAKARSA CITEUREUP | IR. ERI SETIA ROMADHON, MT. | OKE | |||
12 | SIRIYAH NINDRY NOVIARDINI | 2014731150074 | EARNED VALUE ANALYSIS TERHADAP BIAYA PADA PROYEK PEMBANGUNAN GEDUNG PADA PROYEK APARTEMEN IZZARA SIMATUPANG CILANDAK | IR. ERI SETIA ROMADHON, MT. | OKE | |||
13 | ADE TRIYANA RAMADHANI | 2014731150041 | PERENCANAAN METODE PELAKSANAAN OVERLAY PADA LANDASAN BANDARA MATAK | IR. H. INDARTONO RIVAI, MM. | OKE | |||
14 | ANDIK DWI YULIANTO | 2014731150042 | MENGHITUNG KEKUATAN PEMECAH GELOMBANG DAN KOLAM PELABUHAN PADA INSTALASI MILITER LANTAMAL TARAKAN TARAKAN KALIMANTAN TIMUR | IR. H. INDARTONO RIVAI, MM. | OKE | |||
15 | EVI NORMA PUSPITA | 2014731150054 | OPTIMALISASI KINERJA SIMPANG TIGA KAREDENAN DI KABUPATEN BOGOR | IR. H. INDARTONO RIVAI, MM. | OKE | |||
16 | FAJARUDDIN NOOR CAHYANTO | 2014731150055 | STUDI KASUS KEBUTUHAN GROUND ANCHOR PADA DIAPHRAGM WALL MENGGUNAKAN PROGRAM PLAXIS.8 PROYEK LAVIE ALL SUITES APARTEMENT KUNINGAN JAKARTA SELATAN | IR. H. INDARTONO RIVAI, MM. | OKE | |||
17 | MUHAMMAD NISMI | 2014731150063 | ANALISA PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING SYSTEM DAN BEKISTING KONVENSIONAL PADA PROYEK HOTEL PREMIER INN SENTUL | IR. H. INDARTONO RIVAI, MM. | OKE | |||
18 | YAHYA AL ANSORI | 2014731150078 | ANALISA PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN BEKISTING PLAT MENGGUNAKAN BONDEK DAN MULTIPLEK (STUDI KASUS PROYEK GEDUNG LEARNING BPJS, BOGOR) | IR. H. INDARTONO RIVAI, MM. | OKE | |||
19 | ARDHIKA MAULIDIANSYAH | 2014731150046 | ANALISIS KETERLAMBATAN WAKTU PADA PEKERJAAN GALIAN BASEMENT TERHADAP KERUGIAN PROYEK PADA PROYEK APARTEMEN IZZARA CILANDAK | IR. HJ. FATMAWATI OEMAR, MM. | OKE | |||
20 | ARYO SURYO WIBOWO | 2014731150047 | ESTIMASI DAN ANALISA CASH FLOW PEKERJAAN STRUKTUR PONDASI PROYEK GREEN PRAMUKA CITY APARTEMENT | IR. HJ. FATMAWATI OEMAR, MM. | OKE | |||
21 | OLGA MARINTAN RAJAGUKGUK | 2014731150066 | ANALISA DAYA DUKUNG PONDASI BORPILE PADA TOWER BTS ANGULAR 4 LEG TINGGI 52 M TONASE 9,203 TON DI DAERAH TUBAN JAWA TIMUR | IR. HJ. FATMAWATI OEMAR, MM. | OKE | |||
22 | PERDIYANSAH | 2014731150068 | PERENCANAAN PONDASI TIANG PANCANG PADA PROYEK FEDEX DI LOKASI MM 2100 CIBITUNG | IR. HJ. FATMAWATI OEMAR, MM. | OKE | |||
23 | WAHYU NUGROHO | 2014731150077 | PERBANDINGAN BIAYA DAN WAKTU PADA PEKERJAAN PASANGAN BATA DAN BEKISTING PROYEK GREEN ANDARA RESIDENCES | IR. HJ. FATMAWATI OEMAR, MM. | OKE | |||
24 | RINI SATRIANI | 2012731150173 | ANALISIS PERBANDINGAN BIAYA DAN WAKTU PADA PEMBANGUNAN BASE TRANSCEIVER STATION (BTS) 4 KAKI DAN 1 KAKI (MONOPOLE) | IR. HJ. FATMAWATI OEMAR, MM. | OKE | |||
25 | BUDIMAN OKTOPRANA | 2014731150049 | ANALISIS PENGATURAN SIMPANG BERSINYAL (STUDI KASUS : SIMPANG MAL METROPOLITAN BEKASI, BEKASI SELATAN) | IR. SRI YUNIARTI, MT. | OKE | |||
26 | DICKY VIRGIAWAN RUKMANA | 2014731150050 | ANALISIS PEMBANGUNAN TOL SURABAYA - MOJOKERTO TERHADAP KINERJA LALULINTAS KABUPATEN SIDOARJO | IR. SRI YUNIARTI, MT. | OKE | |||
27 | NOVIA KARINA PUTRI | 2014731150064 | KAJIAN KEBUTUHAN FASILITAS ZONA SELAMAT SEKOLAH (ZoSS) SEKOLAH DASAR NEGERI CIBULUH 1 KOTA BOGOR | IR. SRI YUNIARTI, MT. | OKE | |||
28 | SANDY RIMAWAN | 2014731150072 | MANAJEMEN DAN REKAYASA LALU LINTAS KAWASAN PASAR MODERN GRAND WISATA DI KABUPATEN BEKASI | IR. SRI YUNIARTI, MT. | OKE | |||
29 | TATIEK AULIA HASMI | 2014731150075 | PENINGKATAN KINERJA JALAN DAN SINPANG DI JALAN GAJAH MADA KABUPATEN SIDOARJO | IR. SRI YUNIARTI, MT. | OKE | |||
30 | DIKA SETYA NURCAHYA NINGRUM | 2014731150051 | STUDI PERAWATAN GEDUNG BERTINGKAT PT. BANK NEGARA INDONESIA (PERSERO) TBK JAKARTA KOTA | IR. SUDARWATI, MM. | OKE | |||
31 | EKO PUTRO PRASETYO | 2014731150053 | STUDI PERAWATAN BANGUNAN PRODUKSI OBAT DI INDUSTRI FARMASI PT. METISKA FARMA KEBAYORAN LAMA JAKARTA SELATAN | IR. SUDARWATI, MM. | OKE | |||
32 | RULI HADIWINATA | 2014731150070 | ANALISIS KEPADATAN LALULINTAS PADA RUAS JALAN RAYA MARGONDA DEPOK | IR. SUDARWATI, MM. | OKE | |||
33 | TRY MADUMA OCTAVIANUS SIMBOLON | 2014731150076 | KAJIAN PUNCAK KECEPATAN DIDASARKAN PADA KELAS JALAN LINTAS BOGOR - SUKABUMI | IR. SUDARWATI, MM. | OKE | |||
34 | ZINNER PARULIAN | 2014731150080 | METODE KONSTRUKSI RIGID PAVEMENT PADA PROYEK JALAN TOL CIJAGO | IR. SUDARWATI, MM. | OKE | |||
PUTUT ARDYANTO | 2011731150056 | ANALISIS PENGARUH PENAMBAHAN BAHAN RETARDER TERHADAP NILAI SLUMP, KUAT TEKAN DAN WAKTU PENGERASAN PADA CAMPURAN BETON | IR. ERI SETIA ROMADHON, MT. | OKE | ||||
35 | ABDUL ROHMAN FAUZI | 2014731150040 | TIDAK AKTIF | |||||
36 | ADITYA NUR FAJRI | 2014731150044 | TIDAK AKTIF | |||||
37 | BIBEN AHMAD BAIQUNI | 2014731150048 | TIDAK AKTIF | 5 | ||||
38 | HARI MUKTI WIBOWO | 2014731150058 | PROPOSAL BELUM MASUK | 6 | ||||
39 | MARIO MALIKI | 2014731150062 | TIDAK AKTIF | 7 | ||||
40 | ONDI DANIEL | 2014731150067 | PROPOSAL BELUM MASUK | 8 | ||||
41 | SADDAM LESMANA | 2014731150071 | TIDAK AKTIF | 9 | ||||
42 | SARA LUTFIANA | 2014731150073 | TIDAK AKTIF | 10 | ||||
Catatan : | ||||||||
1. Syarat Tugas Akhir Nilai harus lengkap dan minimal D | JAKARTA, 26 SEPTEMBER 2015 | |||||||
2. Lunas Pembayaran Uang Kuliah sampai bulan September 2015 | KOORDINATOR TUGAS AKHIR | |||||||
3. Pelaksanaan Seminar & Sidang Desember 2015 | ||||||||
IR. H. INDARTONO RIVAI, MM. |
no reviews yet
Please Login to review.