225x Filetype XLSX File size 0.12 MB Source: cdn-s3-nrspp-2020.s3.ap-southeast-1.amazonaws.com
Sheet 1: instructions
Carrier/Supplier COR Compliance Review | |||||||||||||
Instructions to Auditor | |||||||||||||
1 | contact company to be audited; make appointment for audit and send pre audit checklist to nominee | ||||||||||||
2 | open master copy and save file with name of audited company and date | ||||||||||||
3 | open "report" tab and complete all cells highlighted in green - details will then be copied to other sheets | ||||||||||||
4 | determine if containers are used - use macro button if containers not used | ||||||||||||
5 | determine if contractors are used - use macro button if contractors not used | ||||||||||||
6 | determine if Driver Fatigue Management plans are required - i.e. trips greater than 500k are completed, or drivers travel more than 500k in a 24 hour period - use macro button if DFMP's not required | ||||||||||||
7 | reset buttons available for above macros if error made - scroll to right of macro buttons for reset buttons | ||||||||||||
8 | open "tool" and carry out audit - mark appropriate column "not compliant", "improvement req", or "compliant". | ||||||||||||
9 | complete comment under "non conformance / improvement note raised" Tool will add comment if criteria not addressed | ||||||||||||
10 | open "report" and check all questions answered - sheet will highlight any section incomplete | ||||||||||||
11 | complete any incomplete questions within "tool" | ||||||||||||
12 | agree with auditee on close off dates for NCN and improvements and enter dates in "report" | ||||||||||||
13 | print "report" as summary | ||||||||||||
14 | print "tool" pages as detailed report | ||||||||||||
15 | open "non conformance note" - hit macro button - sheet will infill with summary of NCN and print. Auditee to use this report to notify auditor when required corrective action implemented | ||||||||||||
16 | open "improvement note" - hit macro button - sheet will infill with summary of improvements required and print. Auditee to use this report to notify auditor when corrective action implemented | ||||||||||||
17 | sign audit report pages | ||||||||||||
18 | open "exec summary ncn" - hit macro button - sheet will infill details of NCN and print. Auditor to forward this part of report to his Regional Manager as high level summary report | ||||||||||||
19 | open "exec summary imp req" - hit macro button - sheet will infill details of improvements required and print. Auditor to forward this part of report to his Regional Manager as high level summary report | ||||||||||||
Primary purpose of audit is to build risk based profile on Carrier/Supplier and drive improvements as required | |||||||||||||
Auditor should schedule a reaudit within an agreed timeframe if a number of key criteria are not compliant or need improvement. |
Carrier/Supplier COR Compliance Review | |
Documentation / systems / procedures that may be required to be viewed by, or demonstrated to, auditor | |
OH&S | OH&S Management System |
Systems and procedures to support above Management System | |
Minutes of safety team meetings and timing of meetings | |
Examples of communication of safety issues | |
Lost time injury rate and target | |
First aid injury rate and target | |
Total injury rate and target | |
MVA rate | |
Incident reporting and investigation system | |
CoR | CoR Management System |
Systems and procedures to support above Management System | |
Examples of communication of CoR issues | |
Training records | |
Breach reports | |
Accreditation | Mass Management accreditation |
Maintenance Management accreditation | |
Fatigue Management accreditation | |
List of accreditation non conformances over past 3 years - audit results | |
Employee Training | CoR training program |
OH&S training program | |
Fatigue Management training program | |
Mass and Dimension training program | |
Maintenance Management training program | |
Load Restraint training program | |
Environmental Compliance training program | |
Speeding Compliance training program | |
Driver Fatigue Management Plans training program if drivers travel >500k in 24 hour period | |
Contractor Training | CoR training program |
OH&S training program | |
Fatigue Management training program | |
Mass and Dimension training program | |
Maintenance Management training program | |
Load Restraint training program | |
Environmental Compliance training program | |
Speeding Compliance training program | |
Driver Fatigue Management Plans training program if contractors travel >500k in 24 hour period | |
Risk Assessments | Risk Assessment register |
Risk Assessment procedure | |
Risk Assessment monitoring | |
Inductions | Employee Induction |
Contractor Induction | |
Communications | Public complaints handling |
Communicating to drivers | |
Safety communications | |
Load Restraint | Load Restraint Management System |
Systems and procedures to support above Management System | |
Load restraint techniques | |
Load restraint equipment specification or standards | |
Load restraint Maintenance schedule | |
Non conformance procedure | |
Fatigue Management | Fatigue Management Management System |
Systems and procedures to support above Management System | |
System to determine safe transit times | |
Roster and scheduling system / procedure | |
Review of actual transit times | |
Procedure to consult with driver as to whether they are fit for duty | |
Mass & Dimension | Mass Management Management System |
Systems and procedures to support above Management System | |
Process to check that axle weights and GVM are within limits | |
Process if axle or GVM limits exceeded. | |
Container weight declarations (if applicable) | |
Speed Compliance | Speed Compliance Management System |
Systems and procedures to support above Management System | |
Action taken if employee or contractor exceeds speed limit | |
Pre loaded trailers | Process to ensure preloaded trailers are loaded safely and legally |
Equipment | Daily inspection procedure and records |
R&M process and system | |
Fitness for work | Drug and Alcohol Management System |
Driver health and fitness assessment Management System | |
Non Conformance | System to deal with non conformance |
Environmental | Environmental Management System |
Systems and procedures to support above Management System | |
National Greenhouse & Energy Reporting registration | |
Current major environmental drive within company |
Carrier/Supplier COR Compliance Review | |||||||||||||||||||||
Auditor's name | Date: | no contractors used either as hire, or to haul product in or out | |||||||||||||||||||
Auditor Company | |||||||||||||||||||||
no preloaded containers hauled | |||||||||||||||||||||
Auditee | |||||||||||||||||||||
Location Audit Conducted | no trips over 500k in any 24 hr period | ||||||||||||||||||||
Auditee contact name | |||||||||||||||||||||
Auditee contact position | no trailers are preloaded by others and picked up by or behalf of company | ||||||||||||||||||||
Contact phone number | mobile | office | |||||||||||||||||||
Contact email | |||||||||||||||||||||
Score Card | |||||||||||||||||||||
Section 1 | Occupational Health and Safety Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 2 | Chain of Responsibility Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 3 | Accreditation Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 4a | Employee Training and Education Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 4b | Contractor Training and Education Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 5 | Risk Assessment Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 6 | Induction Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 7 | Communication Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 8 | Load Restraint Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 9 | Fatigue Management Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 10 | Vehicle Mass and Dimension Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 11 | Speed Compliance Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 12 | Preloaded Trailer Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 13 | Equipment Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 14 | Fitness for Work Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 15 | Non Conformance System Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Section 16 | Environmental System Questions | not evident | imp req | compliant | score | ||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Overall | not evident | imp req | compliant | score | |||||||||||||||||
Auditor's Comments | 0 | 0 | 0 | 0% | |||||||||||||||||
0% | 0% | 0% | |||||||||||||||||||
key criteria | 50 | ||||||||||||||||||||
not evident | imp req | compliant | score | ||||||||||||||||||
0 | 0 | 0 | 0 | ||||||||||||||||||
0% | 0% | 0% | 0% | ||||||||||||||||||
Follow Up Actions | |||||||||||||||||||||
Key Criteria not addressed | 0 | ||||||||||||||||||||
Evidence of correction action/s required to be forwarded - close off date | |||||||||||||||||||||
date above evidence received by auditor | signature | ||||||||||||||||||||
Key Criteria requiring improvement to process or procedure | 0 | ||||||||||||||||||||
Evidence of correction action/s required to be forwarded - close off date | |||||||||||||||||||||
date above evidence received by auditor | signature | ||||||||||||||||||||
Number of criteria not addressed | 0 | ||||||||||||||||||||
Evidence of correction action/s required to be forwarded - close off date | |||||||||||||||||||||
date above evidence received by auditor | signature | ||||||||||||||||||||
Number of improvements req | 0 | ||||||||||||||||||||
Evidence of correction action/s required to be forwarded - close off date | |||||||||||||||||||||
date above evidence received by auditor | signature | ||||||||||||||||||||
Is re audit required? | yes / no | ||||||||||||||||||||
Date required | |||||||||||||||||||||
Auditors signature | date | ||||||||||||||||||||
Auditee's contact signature | date |
no reviews yet
Please Login to review.