jagomart
digital resources
picture1_Excel Sample Sheet 42120 | Space Based Solar Power Gantt Chart Template


 271x       Filetype XLSX       File size 0.04 MB       Source: assets.publishing.service.gov.uk


File: Excel Sample Sheet 42120 | Space Based Solar Power Gantt Chart Template
sheet 1 cover sheet space based solar power sbsp innovation gantt chart sheet this spreadsheet contains a gantt chart template to support you in presenting your project plan please complete ...

icon picture XLSX Filetype Excel XLSX | Posted on 15 Aug 2022 | 3 years ago
Partial file snippet.
 
Sheet 1: Cover_sheet
Space Based Solar Power (SBSP) Innovation Gantt chart sheet
This spreadsheet contains a Gantt chart template to support you in presenting your project plan.
Please complete the Gantt chart with details about your project. You should edit the date ranges and add rows/columns as needed. You can find additional guidance in the Space Based Solar Power Innovation application guidance document.

If you are having difficulty completing this spreadsheet and need help contact sbsp.innovation@beis.gov.uk
Excel tips
You can navigate between the sheets by using the ‘Go to’ function (hold control + G keys).

Freeze panes are turned on. To turn off freeze panes select the 'View' ribbon then 'Freeze Panes' then 'Unfreeze Panes'.

The words contained in this file might help you see if this file matches what you are looking for:

...Sheet cover space based solar power sbsp innovation gantt chart this spreadsheet contains a template to support you in presenting your project plan please complete the with details about should edit date ranges and add rowscolumns as needed can find additional guidance application document if are having difficulty completing need help contact sbspinnovation beisgovuk excel tipsyou navigate between sheets by using lsquo go rsquo function hold control g keys freeze panes turned on turn off select view ribbon then unfreeze...

no reviews yet
Please Login to review.