jagomart
digital resources
picture1_Standard Ppt 46855 | Kick Off Briefing Template 4 20 21


 256x       Filetype PPTX       File size 0.28 MB       Source: navysbir.info


File: Standard Ppt 46855 | Kick Off Briefing Template 4 20 21
kick off briefing instructions the following instructions are for any don sbir sttr contract that requires a kick off briefing the instructions are tailored to a phase i kick off ...

icon picture PPTX Filetype Power Point PPTX | Posted on 18 Aug 2022 | 3 years ago
Partial capture of text on file.
           Kick-Off Briefing
              Instructions
    The  following  instructions  are  for  any  DON  SBIR/STTR 
    contract that requires a Kick-Off Briefing.  The instructions are 
    tailored to a Phase I Kick-Off Briefing, but the template may 
    be  modified  as  appropriate  to  meet  Phase  II  deliverable 
    requirements.
    • The  Kick-Off  Briefing  should  address  the  proposed 
     innovation for which the contract was awarded; this is not an 
     overall capabilities briefing of the small business concern.
    • For questions about these instructions, please contact the 
     technical point of contact (TPOC) identified in your contract.
        Delete this instruction slide from the final deliverable
       Phase I Kick-Off Briefing
                Format
    The following format applies to any DON SBIR/STTR 
    contract that requires a Kick-Off Briefing.
    • Use the template provided. DO NOT use your company’s 
     standard briefing template.
    • Do not exceed 15 slides (including title slide, quad chart, 
     briefing content, and FWA certification).
    • Use MS PowerPoint in standard 4:3 size.
    • Convert to PDF for upload.
    • Please note font size smaller than 10 point may not be 
     legible when printed.
        Delete this instruction slide from the final deliverable
              Phase I Kick-Off Briefing 
                                   Content
       Required 
       •  Quad Chart (format provided)
            ─Insert appropriate text in areas marked [Insert….] and 
              delete the brackets
            ─Delete any other [bracketed guidance] on the slides
       •  Distribution statements
            ─On the title slide and noted on each slide as appropriate
            ─DISTRIBUTION STATEMENT B: Distribution authorized to 
              U.S. Government agencies only (fill in reason) (date of 
              determination) or as defined by contract CDRLs
                 Delete this instruction slide from the final deliverable
       Phase I Kick-Off Briefing
                Content
    Required – cont’d
    • Clauses
     ─
     On the title slide and noted on each slide as appropriate
     ─
     Proprietary Information (DFARS - SBIR Data Rights); [Date of the Report]
     ─
     EXPORT CONTROL WARNING REQUIREMENTS FOR 
     REPORTS/DELIVERABLES:  If the technology in this topic is designated 
     in the DoD Broad Agency Announcement as restricted under the 
     International Traffic in Arms Regulations (ITAR), Distribution Statement B 
     must include “Export Controlled” as an additional Reason, and the 
     required additional Export Control Warning shall be included as part of the 
     Distribution Statement on any report cover or deliverable.  Refer to the 
     Phase I contract for the required Export Control Warning requirements. 
     ─
     Other requests for this document shall be referred to the government 
     technical representative listed in the contract. 
        Delete this instruction slide from the final deliverable
       Phase I Kick-Off Briefing 
                 Content
    Suggested (not required)
    • Phase I Discussion
     ─Summary of Work Plan
     ─Schedule
     ─Qualifications of Personnel (for this effort)
     ─Facilities/Equipment
     ─Challenges/Risks and Proposed Mitigation
     ─Transition/Benefits/Planning for Success
    • Reminders
     ─Keep bullets brief as this slide deck is intended to supplement the 
      kick-off briefing meeting
     ─Do NOT embed video
        Delete this instruction slide from the final deliverable
The words contained in this file might help you see if this file matches what you are looking for:

...Kick off briefing instructions the following are for any don sbir sttr contract that requires a tailored to phase i but template may be modified as appropriate meet ii deliverable requirements should address proposed innovation which was awarded this is not an overall capabilities of small business concern questions about these please contact technical point tpoc identified in your delete instruction slide from final format applies use provided do company s standard exceed slides including title quad chart content and fwa certification ms powerpoint size convert pdf upload note font smaller than legible when printed required insert text areas marked brackets other on distribution statements noted each statement b authorized u government agencies only fill reason date determination or defined by cdrls cont d clauses proprietary information dfars data rights export control warning reports deliverables if technology topic designated dod broad agency announcement restricted under internati...

no reviews yet
Please Login to review.