jagomart
digital resources
picture1_Slideshare Management 75317 | 100011336


 246x       Filetype PPTX       File size 0.15 MB       Source: old.amu.ac.in


File: Slideshare Management 75317 | 100011336
09 01 202 ce 410 construction management be viii sem civil 2018 19 ced zhcet amu 2 2 material management definition material management is defined as planning identification procuring storage ...

icon picture PPTX Filetype Power Point PPTX | Posted on 02 Sep 2022 | 3 years ago
Partial capture of text on file.
  09/01/202                               CE 410 – Construction Management BE VIII Sem. (Civil) 2018 – 19 CED ZHCET AMU                                 2
  2
      Material management
          Definition
          •     Material  management  is  defined  as  planning,  identification, 
                procuring, storage, receiving and distribution of materials. 
          •     The purpose of material management is to assure that the right 
                materials  are  in  the  right  place,  in  the  right  quantity  when 
                needed. 
          •     The responsibility of material management department for the 
                flow  of  materials  from  the  time  the  materials  are  ordered, 
                received, and stored until they are used is the basis of material 
                management.
  09/01/202                              CE 410 – Construction Management B Tech VIII Sem. (Civil) 2018 – 19 CED ZHCET AMU                               3
  2
      Material management
          Introduction
          •     Materials  management  is  a  vital  function  for  improving 
                productivity in construction projects.
          •     The management of materials should be considered at all the 
                phases of the construction process.
          •     This is because poor materials management can often affect the 
                overall construction time, quality and budget.
          •     It is important for planning and controlling of materials to ensure 
                that  the  right  quality  and  quantity  of  materials  and  installed 
                equipment  are  appropriately  specified  in  a  timely  manner, 
                obtained at a reasonable cost, and are available when needed.
  09/01/202                              CE 410 – Construction Management B Tech VIII Sem. (Civil) 2018 – 19 CED ZHCET AMU                               4
  2
      Material management
          Aim of materials management
          •     the right quality
          •     right quantity of supplies
          •     at the right time
          •     at the right place
          •     for the right cost
  09/01/202                              CE 410 – Construction Management B Tech VIII Sem. (Civil) 2018 – 19 CED ZHCET AMU                               5
  2
      Material management
          Process of construction material management
          •     Material planning
          •     Purchasing
          •     Store keeping
          •     Inventory control
          •     Receiving, inspection and despatching
          •    Value analysis, standardization and variety reduction
          •     Materials handling
          •     Disposal of scrap and surplus, material preservation
  09/01/202                              CE 410 – Construction Management B Tech VIII Sem. (Civil) 2018 – 19 CED ZHCET AMU                               6
  2
      Material management
          Primary objectives
          •     Efficient materials planning
          •     Buying or purchasing
          •     Procuring and receiving
          •     Storing and inventory control
          •     Supply and distribution of materials
          •     Quality assurance
The words contained in this file might help you see if this file matches what you are looking for:

...Ce construction management be viii sem civil ced zhcet amu material definition is defined as planning identification procuring storage receiving and distribution of materials the purpose to assure that right are in place quantity when needed responsibility department for flow from time ordered received stored until they used basis b tech introduction a vital function improving productivity projects should considered at all phases process this because poor can often affect overall quality budget it important controlling ensure installed equipment appropriately specified timely manner obtained reasonable cost available aim supplies purchasing store keeping inventory control inspection despatching value analysis standardization variety reduction handling disposal scrap surplus preservation primary objectives efficient buying or storing supply assurance...

no reviews yet
Please Login to review.