jagomart
digital resources
picture1_Construction Pdf 84650 | Top Ryde City Redevelopment 2008 Appendix N Residential Staging And Construction Methodology Review Pdf 637 Kb


 236x       Filetype PDF       File size 0.65 MB       Source: www.ryde.nsw.gov.au


File: Construction Pdf 84650 | Top Ryde City Redevelopment 2008 Appendix N Residential Staging And Construction Methodology Review Pdf 637 Kb
top ryde redevelopment residential staging construction methodology review residential staging construction methodology review top ryde shopping centre july 2008 prepared by bovis lend lease july 2008 1 top ryde redevelopment ...

icon picture PDF Filetype PDF | Posted on 13 Sep 2022 | 3 years ago
Partial capture of text on file.
                Top Ryde Redevelopment - Residential Staging & Construction Methodology Review 
          
          
                    Residential Staging & 
                   Construction Methodology 
                           Review 
                       TOP RYDE SHOPPING CENTRE 
                              July 2008 
                               
         Prepared by Bovis Lend Lease               
         July 2008 
                                                     1 
                                  Top Ryde Redevelopment - Residential Staging & Construction Methodology Review 
                    
                    
                   Top Ryde Shopping Centre Redevelopment 
                   RESIDENTIAL 
                   1.0 INTRODUCTION & BACKGROUND 
                   This report has been prepared by Bovis Lend Lease following a request from The Beville Group to 
                   provide advice on construction staging and methodology for the residential buildings at Top Ryde 
                   Shopping Centre and provide commentary on potential impacts and issues that may have an 
                   impact on the retail development and adjoining properties. 
                   This report has been prepared following Development Consent No.1025/2007 acknowledging 
                   Consent Condition No.3 calling for amendment of LDA672/2006 Construction Management Plan 
                   before commencement of works for construction of Levels 3 & 4 slabs and completion of 
                   perimeter façade to 1200mm above Level 4 within Stage 1 retail works at Top Ryde Shopping 
                   Centre. The inclusion of these works in the retail stage will provide significant separation between 
                   operating retail areas and residential construction. This report sets out the construction 
                   methodology for the residential works based on this staging and completion of Stage 1 retail 
                   works. 
                   This report focuses on the following key elements: 
                       •   Construction Staging Options 
                       •   Construction Methodology 
                       •   Impacts of the construction of the Residential buildings on the Retail development 
                           components and adjoining properties 
                   This report assumes that all necessary authority approvals will be reasonably attainable. 
                   1.1    Construction Staging Options 
                   BLL examined the options for the residential staging for the purposes of this report, and has 
                   prepared the commentary based on construction of Buildings B and F directly following the retail 
                   works completing 1200mm above Level 4. 
                   BLL has also examined the construction methodology and potential impacts on the overall 
                   development during construction of the remaining residential buildings. Therefore construction of 
                   residential buildings B & F will be referred to as Phase 1 residential, and buildings C,D & E will be 
                   referred to as Phase 2 residential. 
                    
                    
                   Prepared by Bovis Lend Lease                                                              
                   July 2008 
                                                                                                               2 
                Top Ryde Redevelopment - Residential Staging & Construction Methodology Review 
          
          
          
         1.2 Construction Methodology 
         BLL have addressed the methodology that should be applied for each of the Phases nominated 
         above, as well as the impacts on the overall development to enable a commentary on the most 
         appropriate buildings to be incorporated in Phase 1 residential. 
         1.3 Construction Impacts 
         The mitigation options in this report included consideration of the construction logistics and the 
         impacts on the retail development and adjoining properties during the construction of both the 
         integrated residential stage and the remaining residential buildings. 
         Prepared by Bovis Lend Lease               
         July 2008 
                                                     3 
                                      Top Ryde Redevelopment - Residential Staging & Construction Methodology Review 
                     
                     
                     2.0 RESIDENTIAL CONSTRUCTION PHASE 1 
                     2.1      Buildings B & F 
                     2.1.1 Construction Methodology 
                     The predecessor for commencement of the residential component of the development is the 
                     completion all of Level 3 slab on RL 69.70 and Level 4 slab on RL 72.50 in Stage 1 retail works. 
                     The completion of these slabs provides a separation to retail whereby Level 2 retail car parking is 
                     a significant distance away from residential construction on Level 4. 
                     The first activity for the residential component is the construction of Level 5 (SSL 75.62) This 
                     area of structure required to be constructed is governed by the footprint of the residential 
                     buildings B & F as well as the requirement to build over Level 3 Service Bay and Tucker Street 
                     ramps. 
                     The Tucker Street ramps provide the only access to the Service Bay on Level 3 from Pope Street; 
                     Tucker Street will be the utilised as the main materials handling zone for the residential buildings 
                     upon removal of the residential tower cranes. 
                     Level 5 will be constructed utilising the retail tower cranes prior to them being dismantled and 
                     removed. Once this level is constructed, it will form the base for the individual residential 
                     structures. 
                      
                      
                      
                      
                    Prepared by Bovis Lend Lease                                                                           
                    July 2008 
                                                                                                                                4 
The words contained in this file might help you see if this file matches what you are looking for:

...Top ryde redevelopment residential staging construction methodology review shopping centre july prepared by bovis lend lease introduction background this report has been following a request from the beville group to provide advice on and for buildings at commentary potential impacts issues that may have an impact retail development adjoining properties consent no acknowledging condition calling amendment of lda management plan before commencement works levels slabs completion perimeter facade mm above level within stage inclusion these in will significant separation between operating areas sets out based focuses key elements options components assumes all necessary authority approvals be reasonably attainable bll examined purposes b f directly completing also overall during remaining therefore referred as phase c d e addressed should applied each phases nominated well enable most appropriate incorporated mitigation included consideration logistics both integrated predecessor component ...

no reviews yet
Please Login to review.