222x Filetype PDF File size 0.04 MB Source: www.unicef.org
BILL OF QUANTITIES Gabion wall construction for protection of TLC in different districts and locations Page 1 of 5 Item Total Rate / Units (NPR) Amount Kalika Shree Shree Srijansil Gahate Ni Ma V, Description Elementary Suryamukhi LSS, Shakhauri, Bahuntipling, No. School, Babala, Elementary sindhuli sindhuli Quantity Unit In Fig. In Words (NPR) Sindhuli School, Sindhuli 1 SITE CLEARANCE 1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 4.00 L.S positioning) 2 EARTH WORK 2.2 E/W in excavation for structures in common soil, lead 50.0 m, lift upto 3.0m, all complete 16 16 11 16 59.00 m³ 3 GABION AND STONE WORKS 3.1 Supplying, fabrication, assembling, placing in position of gabion box consisting of hexagonal mesh size 100 x100mm, including rolling, cutting, weaving with 10 SWG wire, binding the gabions together and tying down the lids with binding wire 12 SWG, all complete. 2x1x1m Box 32 32 22 32 118.00 box 3.2 Supply and Filling stones in gabions, all complete 64 64 44 64 236.00 m³ Page Total : Total Cost page 1: Transportation cost page 1 Page 1 Total BILL OF QUANTITIES Gabion wall construction for protection of TLC in different districts and locations Page 2 of 5 Item Total Rate / Units (NPR) Amount Description Bishnu Pra Vi., Shanka Devi No. Gorkha Pra. Vi., Gorkha Quantity Unit In Fig. In Words (NPR) 1 SITE CLEARANCE 1.1 Site Clearance (to make the bed surface of gabion 1 1 2.00 L.S positioning) 2 EARTH WORK 2.2 E/W in excavation for structures in common soil, lead 50.0 m, lift upto 3.0m, all complete 16 26 42.00 m³ 3 GABION AND STONE WORKS 3.1 Supplying, fabrication, assembling, placing in position of gabion box consisting of hexagonal mesh size 100 x100mm, including rolling, cutting, weaving with 10 SWG wire, binding the gabions together and tying down the lids with binding wire 12 SWG, all complete. 2x1x1m Box 32 52 84.00 box 3.2 Supply and Filling stones in gabions, all complete 64 104 168.00 m³ Page Total : Total Cost page 2: Transportation cost page 2 Page 2 Total BILL OF QUANTITIES Gabion wall construction for protection of TLC in different districts and locations Page 3 of 5 Item Dowongpokhari Jankalyan Total Rate / Units (NPR) Amount Basic School, Samaj Bikash Secondary Shree Janashakti Ganesh Ma Vi, No. Description Sindhupalchow Pra V, School, PS, Kavre Ganeshthan, Quantity Unit In Fig. In Words (NPR) k Sindhupalchowk Ghartichap, Nuwakot Kavre 1 SITE CLEARANCE 1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 1 5.00 L.S positioning) 2 EARTH WORK 2.2 E/W in excavation for structures in common soil, lead 50.0 m, lift upto 3.0m, all complete 16 16 11 16 16 75.00 m³ 3 GABION AND STONE WORKS 3.1 Supplying, fabrication, assembling, placing in position of gabion box consisting of hexagonal mesh size 100 x100mm, including rolling, cutting, weaving with 10 SWG wire, binding the gabions together and tying down the lids with binding wire 12 SWG, all complete. 2x1x1m Box 32 32 22 32 32 150.00 box 3.2 Supply and Filling stones in gabions, all complete 64 64 44 64 64 300.00 m³ Page Total : Total Cost page 3: Transportation cost page 3 Page 3 Total BILL OF QUANTITIES Gabion wall construction for protection of TLC in different districts and locations Page 4 of 5 Item Bulungkhani Shree Mahadev Shree Man Devistan Lower Chhiringe Basic Total Rate / Units (NPR) Amount Description Pra.vi, Bulung, Pra V, Sailung, Mohan sikshya Secondary School, No. Dolakha Dolakha Sadan pra v, School, Bijulikot,Ramec Quantity Unit In Fig. In Words (NPR) Dolakha Okhaldhunga hhap. 1 SITE CLEARANCE 1.1 Site Clearance (to make the bed surface of gabion 1 1 1 1 1 5.00 L.S positioning) 2 EARTH WORK 2.2 E/W in excavation for structures in common soil, lead 50.0 m, lift upto 3.0m, all complete 11 11 11 16 16 65.00 m³ 3 GABION AND STONE WORKS 3.1 Supplying, fabrication, assembling, placing in position of gabion box consisting of hexagonal mesh size 100 x100mm, including rolling, cutting, weaving with 10 SWG wire, binding the gabions together and tying down the lids with binding wire 12 SWG, all complete. 2x1x1m Box 22 22 22 32 32 130.00 box 3.2 Supply and Filling stones in gabions, all complete 44 44 44 64 64 260.00 m³ Page Total : Total Cost page 4: Transportation cost page 4 Page 4 Total
no reviews yet
Please Login to review.