jagomart
digital resources
picture1_Art Therapy Pdf 92642 | Cc4 Th Basic Concepts Of Surveying And Survey Instrument Ts


 170x       Filetype PDF       File size 3.19 MB       Source: www.thkjaincollege.ac.in


File: Art Therapy Pdf 92642 | Cc4 Th Basic Concepts Of Surveying And Survey Instrument Ts
basic concepts of surveying and survey instrument dumpy level basic concepts of surveying and survey instrument dumpy level definition and terms used in levelling principles of levelling reduction of levels ...

icon picture PDF Filetype PDF | Posted on 16 Sep 2022 | 3 years ago
Partial capture of text on file.
 Basic concepts 
 of surveying 
 and survey 
 instrument: 
 Dumpy Level
   Basic concepts of surveying and survey instrument: 
   Dumpy Level
   • Definition and terms used in levelling.
   • Principles of levelling.
   • Reduction of levels by Collimation method and Rise and Fall method.
   • Levelling difficulties.
   • Knowledge about the instrument: Dumpy Level.
   • Purpose of levelling.
   • Classification of levelling.
   • Curvature and Refraction.
   Basic concepts of surveying and survey instrument: 
   Dumpy Level
   • Definition and terms used in levelling.
   • Principles of levelling.
   • Reduction of levels by Collimation method and Rise and Fall method.
   • Levelling difficulties.
   • Knowledge about the instrument: Dumpy Level.
   • Purpose of levelling.
   • Classification of levelling.
   • Curvature and Refraction.
                Levelling                               Principle of Levelling
   An art of determining the relative            The principle      of   levelling  lies   in
   height of different points on, above          furnishing a horizontal line of sight and
   or belowthesurface.                           finding the vertical distances of points
   Levelling is of prime importance to           above or below the line of sight.
   an engineer for the purpose of                The line of sight is provided with a level
   planning, designing and executing             and a graduated levelling staff is used
   the                                           for measuring the height of the line of
   various engineering projects such as          sight above the staff positions.
                                                 .
   roads, railways, canals, dams, water
   supplyandsanitaryschemesetc.
   The success of any engineering
   project is based upon the accurate
   and complete levelling work of the
   project.
The words contained in this file might help you see if this file matches what you are looking for:

...Basic concepts of surveying and survey instrument dumpy level definition terms used in levelling principles reduction levels by collimation method rise fall difficulties knowledge about the purpose classification curvature refraction principle an art determining relative lies height different points on above furnishing a horizontal line sight or belowthesurface finding vertical distances is prime importance to below engineer for provided with planning designing executing graduated staff measuring various engineering projects such as positions roads railways canals dams water supplyandsanitaryschemesetc success any project based upon accurate complete work...

no reviews yet
Please Login to review.